Construction Step Judging

The construction step judging provides assurance that rafts will not break up during the night when teams are asleep.

The 10kg danforth anchors provide assurance that the raft will not drift, even in a strong wind.

The navigation lights help the overnight safety boats to find the rafts in the dark.

Each team will have a ‘Construction Step Card'.  Please ask at the HQ for an inspection when you reach the end of a step.  Once the judges are satisfied that the structure is seaworthy, your card will be signed and your team can continue the next step.

The steps are:

Step

Title

Criteria

1

Frame - basic raft frame before drums are added

a) Suitable spars (-1 per unsuitable)

b) Lashings correct and tight

c) Manila rope in good condition

d) Rope ends finished (-1 per unfinished end)

e) Base sturdy

f)  Samson post built securely

g) Team number on display on building site

2

Drums - once drums have been attached to the frame

a) Quantity suitable for frame (-1 too few)

b) Suitably positioned (-1 per overly large gap)

c) Rope end finished (-1 per unfinished end)

d) Lashing ended off neatly (-1 for each not neat)

e) Drums securely lashed (-1 per drum not secure)

f) Manila rope in good condition

3

Deck - once all decking has been secured

a) Suitable material for all decking pieces

b) Appropriate method of attachment

c) Decking secure

d) Decking stable and rigid

e) Decking pieces fitted neatly

f)  Deck size appropriate to frame

g) Port side clear for a boat to moor

h) Push point at the back using a tyre

4

Hut - basic weatherproofed structure

a) Sturdy frame of suitable material

b) Frame secured to raft base

c) Suitable weatherproofing

d) Frame pioneered

e) Sturdy walls secured to frame

f)  Sturdy roof secured to frame

g) Separate rooms for kitchen and toilet

5

Final boarding checks

Mast & sail (painted with the mask), flags

Gas cooking stove & at least 4 litres water each

Separate sleeping area for boys and girls

6 punting poles

Chemical toilet, separate and private with a door

2 signs (1m, black on white)

Safety equipment

PFDs, whistles etc

Navigation lights – mast (360), port, starboard

Fire extinguisher

Two 10kg Danforth anchors, with uncoiled ropes